Starbucks
Problem This popular south Lethbridge coffee shop required our assistance when problems
from previous construction practices were revealed. Light standards and signs required stabilization and a deep
fill on a portion of the site was required.
Solution We were able to engineer, design and install a screw pile solution that would
stabilize foundation, fixtures, lights and signs. The installation was completed very quickly with no
disturbance to Starbucks or its surrounding businesses.
|
 |
|
 |