Mike Mountain Horse School
Problem This elementary school located in west Lethbridge needed a foundation installed
for portable classrooms. Access to
the site was problematic, time-lines were short and the foundation needed to be
installed through existing pavement.
Solution In spite of winter weather conditions, tight access and limited time, the
Inland Screw Piling team was able to solve the problem very quickly. The
foundations were engineered to fit the exact location and we were able to
install the piles rapidly and safely with minimal disruption to the school
operation.
|
 |
|
 |